Domain scope
Compare project dates, planned units and costs with the completion fields represented in the public sample.
Read the published guide →Nairobi · Built environment
Compare project dates, planned units and costs with the completion fields represented in the public sample.
Public sample available
Published domain facts
Compare project dates, planned units and costs with the completion fields represented in the public sample.
Read the published guide →Public sample available
Preview samples & fields →Projects are administrative histories, not BIM or architectural models. Licence references are illustrative, not professional registrations. Affordable-housing linkage is unimplemented; construction does not automatically create a housing unit. Application and Review share one pending phase. Named real project exceptions are documented.
Review the source limits →Follow synthetic projects through planning, permits, inspection and completion. Connected land, businesses and residents provide the wider city context.
Inspect the published scope and deployment boundaries.
FCTE models construction as a lifecycle, not a static inventory of buildings. A synthetic project moves through planning, permitting, professional oversight, site inspection and completion — within the same City Twin™ as land, business, employment and housing.
A building should not appear overnight — and in FCTE, it doesn't.
Nairobi City Twin™ · 1940–2026
| Project code | Status | Start date | Planned end date | Planned units | Completed units | Project budget | Actual project cost |
|---|---|---|---|---|---|---|---|
| CPJ/0060331 | Active | 1989-04-28 | 1991-10-28 | 533 | 239 | 2144000000.00 | 2401280000.00 |
| CPJ/0085008 | Active | 1981-05-11 | 1984-12-11 | 774 | 348 | 835500000.00 | 1052730000.00 |
| CPJ/0081081 | Active | 2007-04-16 | 2009-02-16 | 783 | 352 | 3532000000.00 | 4450320000.00 |
Showing 3 of 100 sample rows and 8 of 9 fields. “Not recorded” is a display label; downloads retain original values.
The published code identifying the project. Codes are retained as supplied in the source.
Original field: ProjectCode
Example: CPJ/0060331
The state recorded for the in this extract.
Original field: Status
Example: Active
The date recorded for the start event.
Original field: StartDate
Example: 1989-04-28
The date recorded for the planned end event.
Original field: PlannedEndDate
Example: 1991-10-28
The number of housing or construction units planned for the project.
Original field: PlannedUnits
Example: 533
The number of project units recorded as complete.
Original field: CompletedUnits
Example: 239
The recorded project budget, in local currency.
Original field: BudgetLocal
Example: 2144000000.00
The project cost recorded to date, in local currency.
Original field: ActualCostLocal
Example: 2401280000.00
ProjectCodeProject codeWardIdWard referenceStatusStatusStartDateStart datePlannedEndDatePlanned end datePlannedUnitsPlanned unitsCompletedUnitsCompleted unitsBudgetLocalProject budgetActualCostLocalActual project costInspect the published definitions and release context.
Representative public release rows — exact run-level values are intentionally not published. Explore the release-backed analysis-ready examples in City Twin™ for current data.
Explore Construction Data →
| Public entity family | Represents | Disclosure boundary |
| Project context | Synthetic construction projects, geography and sector context | Physical project fields and identifiers are controlled |
| Permit & approval context | Lifecycle approvals and regulatory milestones | Exact workflow and dependencies are controlled |
| Project phases | Construction progress through time | Transition sequencing and timing rules are controlled |
| Built-environment links | Land, housing and area context | Complete physical relationship graph is controlled |
| ProjectCode | Permit | Inspections | Passed | Project Status | Timeline |
| CPJ/0028419 | APPROVED | 4 | 4 | Completed | 2021 → 2024 |
| CPJ/0041207 | APPROVED | 2 | 1 (1 remediation) | Active | 2023 → — |
| CPJ/0009981 | REJECTED | 0 | — | Planned | — → — |
Inspect the published definitions and release context.
| Domain or context | Relationship and published scope |
| Land | Project, a documented relationship to Parcel (added this graduation) |
| Business | BuildingPermit / Project, relationship integrity checked |
| Geography | Ward on every Project, BuildingPermit, SiteInspection and OccupancyCertificate row |
| Housing | Project / AffordableHousingProject are plain nullable fields, no relationship enforced today |
| Employment / Economy | a contractor Business participates in Employment and the Economic Modifier the same way any other business does, but no direct direct behavioral link is implemented |
| Infrastructure | planned. The current public release does not assert direct project-to-infrastructure-asset traversal |
Inspect the published definitions and release context.
Connections follow the published domain scope. Optional, contextual and planned relationships retain their stated limits below.
| Domain or context | Relationship and published scope |
| Land | Project, a documented relationship to Parcel (added this graduation) |
| Business | BuildingPermit / Project, relationship integrity checked |
| Geography | Ward on every Project, BuildingPermit, SiteInspection and OccupancyCertificate row |
| Housing | Project / AffordableHousingProject are plain nullable fields, no relationship enforced today |
| Employment / Economy | a contractor Business participates in Employment and the Economic Modifier the same way any other business does, but no direct direct behavioral link is implemented |
| Infrastructure | planned. The current public release does not assert direct project-to-infrastructure-asset traversal |
Striped Donkey V5.89 - 7 September 2026
Counts, prices and “live/today” certification statements reflect this dated edition. They are not a current rerun or offer. The current scope, known limits and accepted quote take priority.
Projects are administrative histories, not BIM or architectural models. Licence references are illustrative, not professional registrations. Affordable-housing linkage is unimplemented; construction does not automatically create a housing unit. Application and Review share one pending phase. Named real project exceptions are documented.
Read the source limits →Explore the entities and states represented by this domain.
Every capability below is backed by release evidence or certification. The public page presents the data model rather than the physical design. Construction does not claim a physical-building (BIM/architectural) model it doesn't have — it models the administrative and regulatory process a development goes through.
the Project record family — synthetic construction and development projects, each with a sector, type, ward, status (Planned/Active/Suspended/Completed), budget and actual cost.
the Building Permit record family — application, approval, fee and expiry dates, permit type (new-construction, extension, renovation, change-of-use, demolition, temporary) and issuing authority.
Projects carry synthetic professional-license references and regulator/inspection context aligned to Nairobi institutions such as county government, NCA and EBK. No record represents an actual professional or approval.
the Site Inspection record family — structural, electrical, plumbing, fire-safety, environmental, final and remedial inspection types, each with a real PASS/CONDITIONAL/FAIL/PENDING outcome.
Every project progresses through four tracked phases — Foundation, Structure, MEP, Finishing — rather than appearing instantly as a completed structure.
the Occupancy Certificate record family — issued only against a project whose own status is Completed, a real, checked invariant (certification check), not an assumption.
Synthetic by design: FCTE construction projects, permits, professional-license references and inspections are analytical representations of a plausible development process. They do not represent actual developments, regulatory approvals, or identifiable real engineers, architects or contractors.
Construction models how the physical city comes into existence — not simply what buildings exist today.
Inspect the published definitions and release context.
FCTE preserves the process that created the synthetic built environment — not only the final state.
Representative public release example — exact live identities and run-level values are intentionally not published. Explore the release-backed analysis examples in City Twin™ for current data.
The public lifecycle uses one pre-decision pending phase. “Application” and “Review” are human-readable views of that phase rather than claims of two separate production states.
All status values above (PENDING/APPROVED/REJECTED/EXPIRED/REVOKED/SUSPENDED; PASS/CONDITIONAL/FAIL/PENDING; ACTIVE/EXPIRED/REVOKED/SUSPENDED) are the governed public status vocabulary in the current release.
Inspect the published definitions and release context.
Construction's public semantic entity coverage is aligned across Nairobi. The issuing authorities, inspecting departments and professional license references are genuinely different real institutions — no integrity rule in Core, each jurisdiction's own extension enforces its own vocabulary.
County government has been the primary building-plan approval authority since the real 2013 devolution transferred that power from local authorities. NCA (National Construction Authority Act No. 41 of 2011) separately registers and regulates contractors and levies a real 0.5% cess on contracts above KES 5M.
FCTE reuses common construction architecture while allowing Nairobi to implement its own regulatory rules, institutions and evidence — not the acronyms themselves, but the fact that the model genuinely diverges where the real cities do.
All 8 events are real, dated rows in the shared historical-event record, category-tagged for Construction, and feed ConstructionEventIndex — the same per-year modifier mechanism every published domain uses to perturb permit-approval-rate and inspection-outcome via the shared event-modifier function.
Phase 1 (Mombasa–Nairobi, main construction Dec 2014 – May 2017) and Phase 2A (Nairobi–Naivasha, Oct 2016 – Oct 2019), contracted to China Road and Bridge Corporation (CRBC). Both rows are marked Completed with real dates and an approximate KES-converted budget.
Both contractor records are marked DORMANT, not ACTIVE or LIQUIDATED — CRBC and CCECC are real, active, globally-operating contractors; only their local project engagement has concluded. This is a deliberate, disclosed distinction, not a claim that either company itself is defunct.
Open Construction Evidence Catalogue →
| Event | Country | Date | Severity | What it represents |
| RONALD-NGALA-COLLAPSE-2006 | Kenya | 2006-01-25 | 0.45 | 5-storey building under construction collapses in Nairobi CBD, 14 deaths — began sustained pressure for regulation |
| NCA-ACT-2011 | Kenya | 2011-01-01 | 0.55 | National Construction Authority Act establishes contractor registration and a 0.5% cess |
| MLOLONGO-COLLAPSE-2012 | Kenya | 2012-06-15 | 0.35 | Building collapse, 3 deaths — one of several early-2010s collapses building the case for the NBI |
| NATIONAL-BUILDING-INSPECTORATE-2015 | Kenya | 2015-06-01 | 0.60 | NBI formed directly in response to the growing number of collapsed buildings |
Projects are administrative histories, not BIM or architectural models. Licence references are illustrative, not professional registrations. Affordable-housing linkage is unimplemented; construction does not automatically create a housing unit. Application and Review share one pending phase. Named real project exceptions are documented.
Projects are administrative histories, not BIM or architectural models. Licence references are illustrative, not professional registrations. Affordable-housing linkage is unimplemented; construction does not automatically create a housing unit. Application and Review share one pending phase. Named real project exceptions are documented.
Synthetic projects, permits and occupancy certificates do not correspond to actual developments or regulatory approvals unless explicitly documented otherwise (the two real, named infrastructure projects above).
CORENLicenseRef, ARCONLicenseRef, NCALicenseRef and EBKLicenseRef are real-shaped reference fields, not registrations against any real engineer, architect or contractor.
Project and AffordableHousingProject link are plain nullable fields with no relationship today. Don't assume every construction project currently creates a Housing Unit — that linkage isn't implemented yet.
The public model has one pre-decision pending phase. The plain-English “Application” and “Review” labels describe that same phase rather than separate production states.
Unless represented elsewhere, a construction project is not a Building Information Model (BIM) or detailed architectural drawing set — it is an administrative and regulatory-lifecycle record.
The remaining ~100,000+ generated projects per city are fully synthetic, real-shaped records, not disguised real developments.
View All Construction Limitations →
Inspect the published definitions and release context.
Construction carries some of the clearest lifecycle invariants on this site: a permit can't approve before it's applied for, an inspection can't predate the project it inspects, and an occupancy certificate can't exist against a project that isn't actually Completed.
Open Construction Realism Report →
The published construction certification set covers volume sufficiency, relationship integrity, temporal ordering, lifecycle completeness and realism checks for schedule and cost behavior. Internal rule expressions remain controlled.
C13–C15 were added for the two genuinely new capabilities this graduation introduced; C16 is a regression guard added after a real external audit found unbounded inspection dates.
Explore Every Construction Check →
Choose the records, dates and connected domains you need. Final availability, delivery scope and licensing are agreed with your quote.
Read the terms for public previews and commercial orders before requesting your extract.
Explore the supplied synthetic example and its source references.
A real Construction Project, started 1998-10-27.
Real ProjectPhase and SiteInspection rows track the build against this real, dated project.
A Building Permit enters the applicable approval process with its own jurisdiction's authority.
A real OccupancyCertificate, issued by COUNTY-GOVT — the completed development entering the synthetic built environment.
Land → Project → Permit → Build → Inspect → Complete → City.
Available as Standalone Domain · Multi-Domain Bundle · Full City Twin™