    "ProjectCode": "LOS-CPRO/0001888",
    "WardId": "245",
    "Status": "Completed",
    "StartDate": "1958-02-19",
    "PlannedEndDate": "1961-05-19",
    "PlannedUnits": "31",
    "CompletedUnits": "29",
    "BudgetLocal": "428000000.00",
    "ActualCostLocal": "415160000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001914",
    "WardId": "117",
    "Status": "Completed",
    "StartDate": "1941-05-09",
    "PlannedEndDate": "1946-04-09",
    "PlannedUnits": "494",
    "CompletedUnits": "469",
    "BudgetLocal": "463000000.00",
    "ActualCostLocal": "513930000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001988",
    "WardId": "89",
    "Status": "Completed",
    "StartDate": "2000-01-18",
    "PlannedEndDate": "2003-02-18",
    "PlannedUnits": "238",
    "CompletedUnits": "226",
    "BudgetLocal": "102000000.00",
    "ActualCostLocal": "93840000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000348",
    "WardId": "104",
    "Status": "Completed",
    "StartDate": "1987-05-28",
    "PlannedEndDate": "1992-04-28",
    "PlannedUnits": "436",
    "CompletedUnits": "414",
    "BudgetLocal": "159000000.00",
    "ActualCostLocal": "195570000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000511",
    "WardId": "190",
    "Status": "Completed",
    "StartDate": "1955-05-19",
    "PlannedEndDate": "1956-05-19",
    "PlannedUnits": "479",
    "CompletedUnits": "455",
    "BudgetLocal": "436000000.00",
    "ActualCostLocal": "422920000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000844",
    "WardId": "255",
    "Status": "Completed",
    "StartDate": "1960-01-02",
    "PlannedEndDate": "1961-10-02",
    "PlannedUnits": "325",
    "CompletedUnits": "308",
    "BudgetLocal": "59000000.00",
    "ActualCostLocal": "51920000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000221",
    "WardId": "88",
    "Status": "Completed",
    "StartDate": "1989-07-15",
    "PlannedEndDate": "1992-05-15",
    "PlannedUnits": "228",
    "CompletedUnits": "216",
    "BudgetLocal": "84000000.00",
    "ActualCostLocal": "72240000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000154",
    "WardId": "194",
    "Status": "Completed",
    "StartDate": "1999-07-08",
    "PlannedEndDate": "2003-10-08",
    "PlannedUnits": "244",
    "CompletedUnits": "231",
    "BudgetLocal": "13000000.00",
    "ActualCostLocal": "12610000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000464",
    "WardId": "88",
    "Status": "Completed",
    "StartDate": "2025-08-22",
    "PlannedEndDate": "2026-03-22",
    "PlannedUnits": "237",
    "CompletedUnits": "225",
    "BudgetLocal": "200000000.00",
    "ActualCostLocal": "214000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000071",
    "WardId": "248",
    "Status": "Completed",
    "StartDate": "2013-03-03",
    "PlannedEndDate": "2014-01-03",
    "PlannedUnits": "167",
    "CompletedUnits": "158",
    "BudgetLocal": "74000000.00",
    "ActualCostLocal": "88060000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000568",
    "WardId": "67",
    "Status": "Completed",
    "StartDate": "1958-07-05",
    "PlannedEndDate": "1961-04-05",
    "PlannedUnits": "93",
    "CompletedUnits": "88",
    "BudgetLocal": "340000000.00",
    "ActualCostLocal": "380800000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000058",
    "WardId": "202",
    "Status": "Completed",
    "StartDate": "2021-07-24",
    "PlannedEndDate": "2023-10-24",
    "PlannedUnits": "185",
    "CompletedUnits": "175",
    "BudgetLocal": "306000000.00",
    "ActualCostLocal": "342720000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000018",
    "WardId": "80",
    "Status": "Completed",
    "StartDate": "1987-07-01",
    "PlannedEndDate": "1988-12-01",
    "PlannedUnits": "202",
    "CompletedUnits": "191",
    "BudgetLocal": "137000000.00",
    "ActualCostLocal": "156180000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001728",
    "WardId": "188",
    "Status": "Completed",
    "StartDate": "1994-11-17",
    "PlannedEndDate": "1999-04-17",
    "PlannedUnits": "99",
    "CompletedUnits": "94",
    "BudgetLocal": "251000000.00",
    "ActualCostLocal": "263550000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001978",
    "WardId": "45",
    "Status": "Completed",
    "StartDate": "2013-02-26",
    "PlannedEndDate": "2014-11-26",
    "PlannedUnits": "367",
    "CompletedUnits": "348",
    "BudgetLocal": "434000000.00",
    "ActualCostLocal": "512120000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001801",
    "WardId": "101",
    "Status": "Completed",
    "StartDate": "1994-05-02",
    "PlannedEndDate": "1996-05-02",
    "PlannedUnits": "305",
    "CompletedUnits": "289",
    "BudgetLocal": "23000000.00",
    "ActualCostLocal": "25070000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001354",
    "WardId": "74",
    "Status": "Completed",
    "StartDate": "1983-06-14",
    "PlannedEndDate": "1985-09-14",
    "PlannedUnits": "233",
    "CompletedUnits": "221",
    "BudgetLocal": "93000000.00",
    "ActualCostLocal": "81840000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000164",
    "WardId": "160",
    "Status": "Completed",
    "StartDate": "1986-05-29",
    "PlannedEndDate": "1987-06-29",
    "PlannedUnits": "115",
    "CompletedUnits": "109",
    "BudgetLocal": "180000000.00",
    "ActualCostLocal": "219600000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000074",
    "WardId": "246",
    "Status": "Completed",
    "StartDate": "2017-11-20",
    "PlannedEndDate": "2020-06-20",
    "PlannedUnits": "278",
    "CompletedUnits": "264",
    "BudgetLocal": "174000000.00",
    "ActualCostLocal": "175740000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001544",
    "WardId": "169",
    "Status": "Completed",
    "StartDate": "1993-11-18",
    "PlannedEndDate": "1994-06-18",
    "PlannedUnits": "277",
    "CompletedUnits": "263",
    "BudgetLocal": "272000000.00",
    "ActualCostLocal": "282880000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000448",
    "WardId": "55",
    "Status": "Completed",
    "StartDate": "1942-10-25",
    "PlannedEndDate": "1947-07-25",
    "PlannedUnits": "144",
    "CompletedUnits": "136",
    "BudgetLocal": "332000000.00",
    "ActualCostLocal": "391760000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000548",
    "WardId": "141",
    "Status": "Completed",
    "StartDate": "1984-09-22",
    "PlannedEndDate": "1989-04-22",
    "PlannedUnits": "351",
    "CompletedUnits": "333",
    "BudgetLocal": "6000000.00",
    "ActualCostLocal": "6780000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001064",
    "WardId": "13",
    "Status": "Completed",
    "StartDate": "2017-08-10",
    "PlannedEndDate": "2021-09-10",
    "PlannedUnits": "481",
    "CompletedUnits": "456",
    "BudgetLocal": "240000000.00",
    "ActualCostLocal": "307200000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001461",
    "WardId": "54",
    "Status": "Completed",
    "StartDate": "2007-07-15",
    "PlannedEndDate": "2009-03-15",
    "PlannedUnits": "200",
    "CompletedUnits": "190",
    "BudgetLocal": "333000000.00",
    "ActualCostLocal": "419580000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001701",
    "WardId": "14",
    "Status": "Completed",
    "StartDate": "1952-06-03",
    "PlannedEndDate": "1954-08-03",
    "PlannedUnits": "98",
    "CompletedUnits": "93",
    "BudgetLocal": "349000000.00",
    "ActualCostLocal": "397860000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001094",
    "WardId": "250",
    "Status": "Completed",
    "StartDate": "1978-04-13",
    "PlannedEndDate": "1981-11-13",
    "PlannedUnits": "94",
    "CompletedUnits": "89",
    "BudgetLocal": "242000000.00",
    "ActualCostLocal": "244420000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000358",
    "WardId": "26",
    "Status": "Completed",
    "StartDate": "1974-04-18",
    "PlannedEndDate": "1976-01-18",
    "PlannedUnits": "307",
    "CompletedUnits": "291",
    "BudgetLocal": "326000000.00",
    "ActualCostLocal": "316220000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000714",
    "WardId": "114",
    "Status": "Completed",
    "StartDate": "1957-06-02",
    "PlannedEndDate": "1959-11-02",
    "PlannedUnits": "6",
    "CompletedUnits": "5",
    "BudgetLocal": "383000000.00",
    "ActualCostLocal": "459600000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001168",
    "WardId": "249",
    "Status": "Completed",
    "StartDate": "1950-06-23",
    "PlannedEndDate": "1952-03-23",
    "PlannedUnits": "337",
    "CompletedUnits": "320",
    "BudgetLocal": "380000000.00",
    "ActualCostLocal": "505400000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001768",
    "WardId": "6",
    "Status": "Completed",
    "StartDate": "1942-06-11",
    "PlannedEndDate": "1943-03-11",
    "PlannedUnits": "82",
    "CompletedUnits": "77",
    "BudgetLocal": "420000000.00",
    "ActualCostLocal": "432600000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001981",
    "WardId": "78",
    "Status": "Completed",
    "StartDate": "2017-11-15",
    "PlannedEndDate": "2021-05-15",
    "PlannedUnits": "478",
    "CompletedUnits": "454",
    "BudgetLocal": "35000000.00",
    "ActualCostLocal": "35000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000668",
    "WardId": "118",
    "Status": "Completed",
    "StartDate": "2000-06-02",
    "PlannedEndDate": "2003-01-02",
    "PlannedUnits": "300",
    "CompletedUnits": "285",
    "BudgetLocal": "14000000.00",
    "ActualCostLocal": "14980000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001724",
    "WardId": "27",
    "Status": "Completed",
    "StartDate": "2017-06-03",
    "PlannedEndDate": "2019-07-03",
    "PlannedUnits": "450",
    "CompletedUnits": "427",
    "BudgetLocal": "284000000.00",
    "ActualCostLocal": "269800000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001748",
    "WardId": "107",
    "Status": "Completed",
    "StartDate": "1968-08-29",
    "PlannedEndDate": "1971-03-29",
    "PlannedUnits": "340",
    "CompletedUnits": "323",
    "BudgetLocal": "86000000.00",
    "ActualCostLocal": "89440000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001074",
    "WardId": "173",
    "Status": "Completed",
    "StartDate": "2004-07-01",
    "PlannedEndDate": "2005-06-01",
    "PlannedUnits": "352",
    "CompletedUnits": "334",
    "BudgetLocal": "407000000.00",
    "ActualCostLocal": "415140000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001374",
    "WardId": "102",
    "Status": "Completed",
    "StartDate": "1957-03-26",
    "PlannedEndDate": "1962-02-26",
    "PlannedUnits": "474",
    "CompletedUnits": "450",
    "BudgetLocal": "427000000.00",
    "ActualCostLocal": "371490000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000121",
    "WardId": "133",
    "Status": "Completed",
    "StartDate": "1947-08-17",
    "PlannedEndDate": "1950-08-17",
    "PlannedUnits": "21",
    "CompletedUnits": "19",
    "BudgetLocal": "410000000.00",
    "ActualCostLocal": "373100000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000471",
    "WardId": "66",
    "Status": "Completed",
    "StartDate": "2007-10-25",
    "PlannedEndDate": "2012-06-25",
    "PlannedUnits": "496",
    "CompletedUnits": "471",
    "BudgetLocal": "267000000.00",
    "ActualCostLocal": "264330000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001844",
    "WardId": "198",
    "Status": "Completed",
    "StartDate": "1946-08-13",
    "PlannedEndDate": "1951-03-13",
    "PlannedUnits": "399",
    "CompletedUnits": "379",
    "BudgetLocal": "292000000.00",
    "ActualCostLocal": "259880000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000788",
    "WardId": "254",
    "Status": "Completed",
    "StartDate": "2016-02-11",
    "PlannedEndDate": "2016-09-11",
    "PlannedUnits": "249",
    "CompletedUnits": "236",
    "BudgetLocal": "22000000.00",
    "ActualCostLocal": "22220000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001251",
    "WardId": "92",
    "Status": "Completed",
    "StartDate": "2023-04-28",
    "PlannedEndDate": "2023-12-28",
    "PlannedUnits": "414",
    "CompletedUnits": "393",
    "BudgetLocal": "319000000.00",
    "ActualCostLocal": "354090000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000241",
    "WardId": "207",
    "Status": "Completed",
    "StartDate": "1963-04-27",
    "PlannedEndDate": "1964-04-27",
    "PlannedUnits": "469",
    "CompletedUnits": "445",
    "BudgetLocal": "418000000.00",
    "ActualCostLocal": "355300000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001664",
    "WardId": "1",
    "Status": "Completed",
    "StartDate": "2009-07-29",
    "PlannedEndDate": "2012-08-29",
    "PlannedUnits": "226",
    "CompletedUnits": "214",
    "BudgetLocal": "280000000.00",
    "ActualCostLocal": "274400000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001718",
    "WardId": "113",
    "Status": "Completed",
    "StartDate": "2007-12-27",
    "PlannedEndDate": "2011-01-27",
    "PlannedUnits": "228",
    "CompletedUnits": "216",
    "BudgetLocal": "84000000.00",
    "ActualCostLocal": "110040000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000191",
    "WardId": "54",
    "Status": "Completed",
    "StartDate": "1942-05-13",
    "PlannedEndDate": "1945-09-13",
    "PlannedUnits": "116",
    "CompletedUnits": "110",
    "BudgetLocal": "82000000.00",
    "ActualCostLocal": "92660000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000378",
    "WardId": "114",
    "Status": "Completed",
    "StartDate": "1948-01-29",
    "PlannedEndDate": "1952-06-29",
    "PlannedUnits": "49",
    "CompletedUnits": "46",
    "BudgetLocal": "161000000.00",
    "ActualCostLocal": "154560000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000824",
    "WardId": "159",
    "Status": "Completed",
    "StartDate": "1986-03-22",
    "PlannedEndDate": "1989-10-22",
    "PlannedUnits": "84",
    "CompletedUnits": "79",
    "BudgetLocal": "224000000.00",
    "ActualCostLocal": "199360000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000921",
    "WardId": "65",
    "Status": "Completed",
    "StartDate": "2023-06-01",
    "PlannedEndDate": "2025-02-01",
    "PlannedUnits": "180",
    "CompletedUnits": "171",
    "BudgetLocal": "297000000.00",
    "ActualCostLocal": "302940000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000461",
    "WardId": "82",
    "Status": "Completed",
    "StartDate": "2020-12-03",
    "PlannedEndDate": "2024-04-03",
    "PlannedUnits": "126",
    "CompletedUnits": "119",
    "BudgetLocal": "100000000.00",
    "ActualCostLocal": "125000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000474",
    "WardId": "84",
    "Status": "Completed",
    "StartDate": "2012-07-13",
    "PlannedEndDate": "2014-06-13",
    "PlannedUnits": "108",
    "CompletedUnits": "102",
    "BudgetLocal": "367000000.00",
    "ActualCostLocal": "484440000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000754",
    "WardId": "174",
    "Status": "Completed",
    "StartDate": "1991-06-26",
    "PlannedEndDate": "1994-09-26",
    "PlannedUnits": "488",
    "CompletedUnits": "463",
    "BudgetLocal": "53000000.00",
    "ActualCostLocal": "62540000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000688",
    "WardId": "211",
    "Status": "Completed",
    "StartDate": "1974-03-15",
    "PlannedEndDate": "1974-12-15",
    "PlannedUnits": "42",
    "CompletedUnits": "39",
    "BudgetLocal": "348000000.00",
    "ActualCostLocal": "368880000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000661",
    "WardId": "191",
    "Status": "Completed",
    "StartDate": "2018-03-31",
    "PlannedEndDate": "2021-03-31",
    "PlannedUnits": "41",
    "CompletedUnits": "38",
    "BudgetLocal": "446000000.00",
    "ActualCostLocal": "512900000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001511",
    "WardId": "174",
    "Status": "Completed",
    "StartDate": "1941-12-28",
    "PlannedEndDate": "1945-10-28",
    "PlannedUnits": "54",
    "CompletedUnits": "51",
    "BudgetLocal": "170000000.00",
    "ActualCostLocal": "166600000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001658",
    "WardId": "174",
    "Status": "Completed",
    "StartDate": "2000-02-21",
    "PlannedEndDate": "2004-03-21",
    "PlannedUnits": "4",
    "CompletedUnits": "3",
    "BudgetLocal": "80000000.00",
    "ActualCostLocal": "107200000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001358",
    "WardId": "68",
    "Status": "Completed",
    "StartDate": "1960-11-27",
    "PlannedEndDate": "1965-06-27",
    "PlannedUnits": "381",
    "CompletedUnits": "361",
    "BudgetLocal": "60000000.00",
    "ActualCostLocal": "58800000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001874",
    "WardId": "55",
    "Status": "Completed",
    "StartDate": "1993-10-15",
    "PlannedEndDate": "1997-11-15",
    "PlannedUnits": "12",
    "CompletedUnits": "11",
    "BudgetLocal": "294000000.00",
    "ActualCostLocal": "332220000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001651",
    "WardId": "186",
    "Status": "Completed",
    "StartDate": "2017-12-19",
    "PlannedEndDate": "2022-06-19",
    "PlannedUnits": "244",
    "CompletedUnits": "231",
    "BudgetLocal": "13000000.00",
    "ActualCostLocal": "11830000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000811",
    "WardId": "87",
    "Status": "Completed",
    "StartDate": "1994-08-12",
    "PlannedEndDate": "1995-02-12",
    "PlannedUnits": "102",
    "CompletedUnits": "96",
    "BudgetLocal": "456000000.00",
    "ActualCostLocal": "606480000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001541",
    "WardId": "1",
    "Status": "Completed",
    "StartDate": "1989-03-01",
    "PlannedEndDate": "1992-07-01",
    "PlannedUnits": "166",
    "CompletedUnits": "157",
    "BudgetLocal": "172000000.00",
    "ActualCostLocal": "209840000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001101",
    "WardId": "223",
    "Status": "Completed",
    "StartDate": "1960-06-15",
    "PlannedEndDate": "1963-08-15",
    "PlannedUnits": "353",
    "CompletedUnits": "335",
    "BudgetLocal": "309000000.00",
    "ActualCostLocal": "287370000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001634",
    "WardId": "214",
    "Status": "Completed",
    "StartDate": "1962-05-27",
    "PlannedEndDate": "1965-12-27",
    "PlannedUnits": "114",
    "CompletedUnits": "108",
    "BudgetLocal": "278000000.00",
    "ActualCostLocal": "347500000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000194",
    "WardId": "101",
    "Status": "Completed",
    "StartDate": "1947-01-30",
    "PlannedEndDate": "1947-08-30",
    "PlannedUnits": "227",
    "CompletedUnits": "215",
    "BudgetLocal": "182000000.00",
    "ActualCostLocal": "172900000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000998",
    "WardId": "83",
    "Status": "Completed",
    "StartDate": "2000-04-29",
    "PlannedEndDate": "2001-11-29",
    "PlannedUnits": "35",
    "CompletedUnits": "33",
    "BudgetLocal": "36000000.00",
    "ActualCostLocal": "41760000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000751",
    "WardId": "109",
    "Status": "Completed",
    "StartDate": "1986-10-07",
    "PlannedEndDate": "1988-04-07",
    "PlannedUnits": "377",
    "CompletedUnits": "358",
    "BudgetLocal": "452000000.00",
    "ActualCostLocal": "384200000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000021",
    "WardId": "110",
    "Status": "Completed",
    "StartDate": "1992-03-19",
    "PlannedEndDate": "1995-05-19",
    "PlannedUnits": "313",
    "CompletedUnits": "297",
    "BudgetLocal": "237000000.00",
    "ActualCostLocal": "227520000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001004",
    "WardId": "242",
    "Status": "Completed",
    "StartDate": "2009-10-05",
    "PlannedEndDate": "2010-05-05",
    "PlannedUnits": "257",
    "CompletedUnits": "244",
    "BudgetLocal": "236000000.00",
    "ActualCostLocal": "309160000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000784",
    "WardId": "166",
    "Status": "Completed",
    "StartDate": "1952-02-27",
    "PlannedEndDate": "1954-11-27",
    "PlannedUnits": "101",
    "CompletedUnits": "95",
    "BudgetLocal": "55000000.00",
    "ActualCostLocal": "50050000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001048",
    "WardId": "85",
    "Status": "Completed",
    "StartDate": "2021-04-13",
    "PlannedEndDate": "2025-01-13",
    "PlannedUnits": "388",
    "CompletedUnits": "368",
    "BudgetLocal": "372000000.00",
    "ActualCostLocal": "327360000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001394",
    "WardId": "54",
    "Status": "Completed",
    "StartDate": "2017-07-07",
    "PlannedEndDate": "2020-08-07",
    "PlannedUnits": "216",
    "CompletedUnits": "205",
    "BudgetLocal": "262000000.00",
    "ActualCostLocal": "225320000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001224",
    "WardId": "189",
    "Status": "Completed",
    "StartDate": "1980-11-12",
    "PlannedEndDate": "1983-10-12",
    "PlannedUnits": "413",
    "CompletedUnits": "392",
    "BudgetLocal": "417000000.00",
    "ActualCostLocal": "500400000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001414",
    "WardId": "210",
    "Status": "Completed",
    "StartDate": "1991-04-19",
    "PlannedEndDate": "1992-07-19",
    "PlannedUnits": "457",
    "CompletedUnits": "434",
    "BudgetLocal": "97000000.00",
    "ActualCostLocal": "82450000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001641",
    "WardId": "91",
    "Status": "Completed",
    "StartDate": "1944-07-29",
    "PlannedEndDate": "1947-09-29",
    "PlannedUnits": "373",
    "CompletedUnits": "354",
    "BudgetLocal": "345000000.00",
    "ActualCostLocal": "403650000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000968",
    "WardId": "45",
    "Status": "Completed",
    "StartDate": "1953-02-25",
    "PlannedEndDate": "1955-03-25",
    "PlannedUnits": "422",
    "CompletedUnits": "400",
    "BudgetLocal": "34000000.00",
    "ActualCostLocal": "31280000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000718",
    "WardId": "199",
    "Status": "Completed",
    "StartDate": "2021-05-17",
    "PlannedEndDate": "2026-02-17",
    "PlannedUnits": "154",
    "CompletedUnits": "146",
    "BudgetLocal": "350000000.00",
    "ActualCostLocal": "455000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000604",
    "WardId": "124",
    "Status": "Completed",
    "StartDate": "2015-02-12",
    "PlannedEndDate": "2016-05-12",
    "PlannedUnits": "427",
    "CompletedUnits": "405",
    "BudgetLocal": "43000000.00",
    "ActualCostLocal": "43000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001804",
    "WardId": "95",
    "Status": "Completed",
    "StartDate": "1999-01-19",
    "PlannedEndDate": "2002-10-19",
    "PlannedUnits": "416",
    "CompletedUnits": "395",
    "BudgetLocal": "123000000.00",
    "ActualCostLocal": "111930000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000438",
    "WardId": "130",
    "Status": "Completed",
    "StartDate": "1955-12-04",
    "PlannedEndDate": "1959-05-04",
    "PlannedUnits": "273",
    "CompletedUnits": "259",
    "BudgetLocal": "165000000.00",
    "ActualCostLocal": "153450000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001554",
    "WardId": "209",
    "Status": "Completed",
    "StartDate": "1980-10-09",
    "PlannedEndDate": "1982-09-09",
    "PlannedUnits": "148",
    "CompletedUnits": "140",
    "BudgetLocal": "439000000.00",
    "ActualCostLocal": "566310000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001018",
    "WardId": "141",
    "Status": "Completed",
    "StartDate": "1974-02-09",
    "PlannedEndDate": "1978-05-09",
    "PlannedUnits": "276",
    "CompletedUnits": "262",
    "BudgetLocal": "370000000.00",
    "ActualCostLocal": "425500000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000484",
    "WardId": "13",
    "Status": "Completed",
    "StartDate": "1999-06-04",
    "PlannedEndDate": "2002-09-04",
    "PlannedUnits": "478",
    "CompletedUnits": "454",
    "BudgetLocal": "35000000.00",
    "ActualCostLocal": "37100000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001174",
    "WardId": "176",
    "Status": "Completed",
    "StartDate": "1959-11-29",
    "PlannedEndDate": "1960-08-29",
    "PlannedUnits": "60",
    "CompletedUnits": "57",
    "BudgetLocal": "81000000.00",
    "ActualCostLocal": "78570000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000301",
    "WardId": "147",
    "Status": "Completed",
    "StartDate": "1971-03-02",
    "PlannedEndDate": "1975-09-02",
    "PlannedUnits": "194",
    "CompletedUnits": "184",
    "BudgetLocal": "422000000.00",
    "ActualCostLocal": "561260000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000174",
    "WardId": "26",
    "Status": "Completed",
    "StartDate": "1973-04-19",
    "PlannedEndDate": "1975-09-19",
    "PlannedUnits": "485",
    "CompletedUnits": "460",
    "BudgetLocal": "347000000.00",
    "ActualCostLocal": "333120000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000274",
    "WardId": "95",
    "Status": "Completed",
    "StartDate": "2015-03-18",
    "PlannedEndDate": "2017-06-18",
    "PlannedUnits": "193",
    "CompletedUnits": "183",
    "BudgetLocal": "21000000.00",
    "ActualCostLocal": "19110000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001824",
    "WardId": "192",
    "Status": "Completed",
    "StartDate": "1972-10-31",
    "PlannedEndDate": "1974-09-30",
    "PlannedUnits": "158",
    "CompletedUnits": "150",
    "BudgetLocal": "457000000.00",
    "ActualCostLocal": "411300000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000308",
    "WardId": "260",
    "Status": "Completed",
    "StartDate": "1953-05-04",
    "PlannedEndDate": "1957-06-04",
    "PlannedUnits": "453",
    "CompletedUnits": "430",
    "BudgetLocal": "489000000.00",
    "ActualCostLocal": "611250000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000381",
    "WardId": "224",
    "Status": "Completed",
    "StartDate": "1952-10-17",
    "PlannedEndDate": "1954-06-17",
    "PlannedUnits": "160",
    "CompletedUnits": "152",
    "BudgetLocal": "261000000.00",
    "ActualCostLocal": "336690000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001334",
    "WardId": "199",
    "Status": "Completed",
    "StartDate": "2009-09-01",
    "PlannedEndDate": "2013-10-01",
    "PlannedUnits": "491",
    "CompletedUnits": "466",
    "BudgetLocal": "258000000.00",
    "ActualCostLocal": "229620000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001428",
    "WardId": "160",
    "Status": "Completed",
    "StartDate": "1955-08-24",
    "PlannedEndDate": "1960-07-24",
    "PlannedUnits": "476",
    "CompletedUnits": "452",
    "BudgetLocal": "231000000.00",
    "ActualCostLocal": "277200000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001171",
    "WardId": "239",
    "Status": "Completed",
    "StartDate": "1955-03-12",
    "PlannedEndDate": "1958-09-12",
    "PlannedUnits": "448",
    "CompletedUnits": "425",
    "BudgetLocal": "480000000.00",
    "ActualCostLocal": "552000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001228",
    "WardId": "195",
    "Status": "Completed",
    "StartDate": "1958-04-28",
    "PlannedEndDate": "1959-01-28",
    "PlannedUnits": "62",
    "CompletedUnits": "58",
    "BudgetLocal": "384000000.00",
    "ActualCostLocal": "499200000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001331",
    "WardId": "148",
    "Status": "Completed",
    "StartDate": "2004-12-13",
    "PlannedEndDate": "2007-04-13",
    "PlannedUnits": "380",
    "CompletedUnits": "361",
    "BudgetLocal": "158000000.00",
    "ActualCostLocal": "169060000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001114",
    "WardId": "14",
    "Status": "Completed",
    "StartDate": "1952-01-24",
    "PlannedEndDate": "1953-10-24",
    "PlannedUnits": "335",
    "CompletedUnits": "318",
    "BudgetLocal": "77000000.00",
    "ActualCostLocal": "77000000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001531",
    "WardId": "104",
    "Status": "Completed",
    "StartDate": "2002-04-10",
    "PlannedEndDate": "2004-04-10",
    "PlannedUnits": "295",
    "CompletedUnits": "280",
    "BudgetLocal": "5000000.00",
    "ActualCostLocal": "4850000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001691",
    "WardId": "134",
    "Status": "Completed",
    "StartDate": "1965-07-13",
    "PlannedEndDate": "1966-05-13",
    "PlannedUnits": "227",
    "CompletedUnits": "215",
    "BudgetLocal": "182000000.00",
    "ActualCostLocal": "161980000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000041",
    "WardId": "27",
    "Status": "Completed",
    "StartDate": "1965-12-30",
    "PlannedEndDate": "1967-04-30",
    "PlannedUnits": "55",
    "CompletedUnits": "52",
    "BudgetLocal": "72000000.00",
    "ActualCostLocal": "68400000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001851",
    "WardId": "80",
    "Status": "Completed",
    "StartDate": "2015-04-16",
    "PlannedEndDate": "2019-06-16",
    "PlannedUnits": "159",
    "CompletedUnits": "151",
    "BudgetLocal": "359000000.00",
    "ActualCostLocal": "473880000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0000868",
    "WardId": "154",
    "Status": "Completed",
    "StartDate": "1997-09-28",
    "PlannedEndDate": "1999-12-28",
    "PlannedUnits": "215",
    "CompletedUnits": "204",
    "BudgetLocal": "360000000.00",
    "ActualCostLocal": "349200000.00"
  },
  {
    "ProjectCode": "LOS-CPRO/0001218",
    "WardId": "129",
    "Status": "Completed",
    "StartDate": "1971-06-07",
    "PlannedEndDate": "1975-05-07",
    "PlannedUnits": "191",
    "CompletedUnits": "181",
    "BudgetLocal": "217000000.00",
    "ActualCostLocal": "227850000.00"
  }
]